Names hide commutes
Two buildings with the same area name can sit 15 minutes apart, on different sides of a toll road.
Pick the part of the metro you want. Each area page decodes every new building there and explains what brings renters to it.
More area pages are in progress. Areas with fewer than 3 new builds are on the board without a page.
From the Parmer Lane tech campuses to the Wells Branch and Tech Ridge corridors, new buildings are competing for the same renters.
East Parmer's newer lease-ups sit minutes from SH-130, while the Harris Branch side trades a longer drive for different utility setups.
Decker Lane's lease-ups sit in unincorporated Travis County yet still run on Austin Energy and Austin Water, a mix that changes the monthly math.
Riverside's newer mid-rises sit close to downtown, while the Del Valle and Onion Creek side is closer to Giga Texas and the airport.
Buildings near the I-35 frontage put Austin within a commute, while the SH-123 side trades drive time for a different utility setup.
Counts, typical special, and 'from' prices render from the feed with each row's pull date. Areas with fewer than 3 new builds aren't listed.
Click a point or a row to cross-highlight. Vacancy: Matthews Q2 2026. Electric: address and property checks, Oct 25, 2026.
Tracked count, market-rate studio/1BR "after special, from" price, typical special, and 2026 first move-ins render from the feed (area.* tokens) with the pull date on each row. ISD is a fact, not a rating. 12 more area pages are in progress.
Two buildings with the same area name can sit 15 minutes apart, on different sides of a toll road.
Across 144 board buildings: Austin Energy 83, Pedernales 28, Bluebonnet 13, Georgetown 3, Oncor 16 (Oct 25, 2026).
From 25.0% in Far North to 16.2% in Southeast (Matthews Q2 2026). Room to ask isn't the same everywhere.
You don't have time to call 20 leasing offices. We do, and confirm the unit, the special, and the written fee sheet the same day during hours.
Prefer to talk? Call or text 512-000-000, Mon-Fri 8 AM-8 PM · Sat 9 AM-6 PM · Sun 12-5 PM.
We'll call or text the same day during hours with your shortlist plan.
Direct answer first, then the source and date. If your question isn't here, ask us on the form or by text.
All five counties in the metro: Travis, Williamson, Hays, Bastrop, and Caldwell. Area pages are live for Far North Austin, Northeast Austin, Far East Austin, Southeast Austin, and San Marcos, and more are in progress.
An area page compares buildings. With fewer than 3 new builds there isn't enough to compare, so those buildings appear on the board without an area page.
Far North Austin at 25.0%, then San Marcos at 19.9%, Northeast at 17.0%, and Southeast at 16.2% (Matthews Q2 2026). Vacancy measures room to ask, not area quality.
No. We list school districts as facts with their lookup links and never use them in a score. We describe buildings and commutes, not the people who live nearby.
Yes. Name an area plus up to four neighborhoods on the form and we'll shortlist across them.
No. The community sets both price and approval. We confirm them in writing before you sign.

Far North 25.0%, San Marcos 19.9%, Northeast 17.0%, Southeast 16.2% (Matthews Q2 2026). What vacancy means for room to ask on a new apartment.
Read the guide
Drive vs. transit, tolls added to true monthly, and I-35 downtown work from 2027 to 2033: a commute decision flow for new Austin apartments.
Read the guideNew buildings matched to your job by free-flow drive time, route, and toll, with the toll added into your true monthly.
New buildings by distance to MetroRapid and rail stops, from each building's durable profile.
A remote shortlist for renters relocating to the metro: five-county overview, electric by area, tolls, and live video walks of the actual unit.
Send us your move date and all-in budget. We confirm the unit, the special, and the written fee sheet the same day during hours, then show you year two before you tour.
We don't guarantee pricing or approval. The community sets both, and we confirm them before you sign.